Section 1-1
Introduction: OCX-V-Plan History
Size: 135K

Section 1-1.1 Purpose of Introducing V-Plan Alternative
Section 1-1.2 County’s Reluctance to Allow FAA to Study OCX-V-Plan
Section 1-1.3 OCRAA'S Recent Support
Section 1-1.4 ALPA'S Recent Support
Section 1-1.5 FAA SOCAL TRACON’S Support
Section 1-1.6 Growing Countywide Support


Section 1-2 OCX-V-Plan Operating Plan Summary
Size:67K

Section 1-2.1 Operations Overview
Section 1-2.2 Precision Approaches
Section 1-2.3 OCX Priority Approaches
Section 1-2.4 Missed Approaches
Section 1-2.5 Conclusion

Section 2-1 Historical Wind Data for MCAS El Toro
Size:1.09MB

Section 2-1.1 38-Year History Overview
Section 2-1.2 Wind Measurements

Attachments pertaining to Section 2-1:

Figure 2-1.1 Wind Rose - All Weather
Figure 2-1.2 Wind Rose - IFR conditions
Figure 2-1.3 Wind Records at MCAS El Toro
Figure 2-1.4 Wind Sensor at MCAS El Toro

Section 2-2 Federal Regulatory Requirements for Measuring Wind Data
Size:39K

Section 2-2.1 FCM-S4-1994 Federal Regulatory Requirements Standards
Section 2-2.2 FAA Advisory Circular 91-54
Section 2-2.3 Conclusion
Section 2-2.4 FCM-S4-1994 Web Site
Section 2-2.5 Federal Web Site Links

Section 3-1 OCX-V-Plan - Phase 1 Airport layout Plan (ALP)
Size:993K

Section 3-1.1 Initial Reuse Plans
Section 3-1.2 OCX-V-Plan - Phase 1 Runways
Section 3-1.3 OCX-V-Plan - Phase 1 Tarmac
Section 3-1.4 OCX-V-Plan - Phase 1 Cargo & Terminal Facilities
Section 3-1.5 OCX-V-Plan - Phase 1 Grading

Attachments pertaining to Section 3-1:

Figure 3-1.1 Orange County Open Space Map
Figure 3-1.2 Phase 1 Airport Layout Plan (ALP)
Figure 3-1.2 Phase 1 Airport Layout Plan (ALP) view & download Acrobat file
Figure 3-1.3 Grading Plan

Section 3-2 OCX-V-Plan - Phase 1 Airport Operating Plan (AOP)
Size:5.08MB

Section 3-2.1 Proposed Approach and Departure Routes
Section 3-2.2 OCX Priority Approaches Departures
Section 3-2.3 Departures
Section 3-2.4 Proposed Residential Developments
Section 3-2.5 Projected Noise Impacts

Attachments pertaining to Section 3-2:

Figure 3-2.1 Phase 1 Approach and Departure Routes, Aerial Photo
Figure 3-2.2 Phase 1 Santa Ana Winds Approach and Departure Routes, Aerial Photo
Figure 3-2.3 Phase 1 Flight Paths over Earthquake Landslide Danger Zones
Figure 3-2.4 Phase 1 Approach and Departure, Elevations-Map
Figure 3-2.5 Phase 1 Approach and Departure, Topographical Map
Figure 3-2.6 Phase 1 STAR Precision Approach to Runway 16L, Approach Chart
Figure 3-2.7 Phase 1 Precision Approach to Runway 16L, Topographical Map
Figure 3-2.8 Phase 1 STAR Precision Approach to Runway 16L, Profile Chart
Figure 3-2.9 Phase 1 STAR Precision Approach to Runway 16L, Topographical Profile
Figure 3-2.10 Phase 1 Runway 16L Standard Instrument Departure, Topographical Map
Figure 3-2.11 Phase 1 Runway 16L Standard Instrument Departure, Topographical Profile
Figure 3-2.12 Pending Developments in the Southwest Open Space Corridor
Figure 3-2.13 Estimated/Anticipated Twenty Year Growth Noise Contour Map

Section 3-3 OCX-V-Plan TERPS Analysis
Section 3-3a - Size:1.1MB
Section 3-3b - Size:1.8MB
Section 3-3c - Size:1.8MB
Section 3-3d - Size:1.8MB
Section 3-3e - Size:1.8MB
Section 3-3f - Size:1.9MB

Section 3-3 Phase 1 TERPS Analysis - Runway 16L

Attachments pertaining to Section 3-3:

Figure 3-3.1 Phase 1 TERPS Calculation of Elevation of Precision Final Approach Fix (PFAF)
Figure 3-3.2 Phase 1 Runway 16L Center-Line Topographic Profile of Final Approach Segment
Figure 3-3.3 Phase 1 TERPS Calculation of Distance from GPI to Displaced Threshold
Figure 3-3.4 Phase 1 TERPS Runway Details of Topographical Airport Layout Plan
Figure 3-3.5 Phase 1 TERPS Calculations of Elevations of "W-surface" at PFAF
Figure 3-3.6 Phase 1 Topographical Map of Runway 16L, Final Approach, TERPS Defined Surfaces
Figure 3-3.7 Phase 1 TERPS Calculation of W, X, & Y Obstacle Clearance Imaginary Surfaces
Figure 3-3.8 Phase 1 TERPS Calculation Worksheet 1 of 2 for W & X Surface's Obstacle-Clearance
Figure 3-3.9 Phase 1 TERPS Calculation Worksheet 2 of 2 for W & X Surface's Obstacle-Clearance
Figure 3-3.10 Phase 1 Topographic Map & Profile, Runway 16L, WXY Obstacle-Clearance at PFAF
Figure 3-3.11 Orange County Surveyor's Notes, Verification of USGS Topographic Digital Data Base
Figure 3-3.12 Phase 1 Topographic Map & Profile, Runway 16L,W Clearance at Controlling Obstacle
Figure 3-3.13 Phase 1 Topographic Map & Profile, Runway 16L, X Clearance at Controlling Obstacle
Figure 3-3.14 Phase 1 Runway 16L Center-line Topographic Profile, X Clearance at Controlling Obstacle
Figure 3-3.15 Phase 1 TERPS Calculation Worksheet 1 of 2 for Y Surface's Obstacle-Clearance
Figure 3-3.16 Phase 1 TERPS Calculation Worksheet 2 of 2 for Y Surface's Obstacle-Clearance
Figure 3-3.17 Phase 1 Topographic Map & Profile, Runway 16L, Y Clearance at Controlling Obstacle


(posting of section coming soon)


(posting of section coming soon)

The entire Engineering Section containing all section, is available on CD-ROM.

c_e_griffin@msn.com for a CD-ROM copy

the Pilots V-Plan: intro overview  comparisons  review  engineering

page last updated6/23/05